Granule machine incorporates many outstanding features to give long &
hassle free operation. The built in hi-tech design is equipped with increased
motor power which ensures high output at minimum operating costs.
This
innovative product will certainly give you relief from a terrific problem of
bend and disturbed cheese pipes. It corrects the inner dia. of your disturbed
cheese pipe and you can Re-Use it.
It
takes just 1/3 minute to correct one cheese pipe.
A
simple hot air dryer will suffice when you need to remove surface moisture from
non-hygroscopic resins. A hot air dryer works very simply. It consists
of a heater blower unit mounted on drying hopper and a control for the HB.
Ambient air is drawn through a filter into a heater/blower unit and heated. The
temperature can be adjusted up to 350˚F. The heater/blower is mounted on the
drying hopper and the hot air is circulated up through the material in the
hopper, carrying surface moisture up and out of the top of the hopper. The
control for the heater/blower can be mounted on the hopper stand or on a nearby
wall.
You
use these same heater blower units in a central drying system but in
that case, dry air is supplied to the HB from the central dryer and the process
air is re-circulated back to the dryer.
In
either case, it is important to provide an HB with a blower large enough to
ensure sufficient airflow through the hopper.
Descriptionl.
Advantage
[single to six station]: absolutely eliminated ideal time maximum utilization
of tape plant easy to operate in six station cutter, cutter will be changed
after 12 days. payback: a. Power saving: in each stoppage it takes minimum of
20 minutes to stop + 60 minutes to change mesh + 20 minutes to start = the total
time is 100 minutes in hole of this time total system is on means power loss is
60 minutes of working load = 150 units [power saving per month =150 units x 30
= 4500 units] a. Power saving: if we dont stop the plant twice in day we will
get minimum one-hour production more. one hour production = 150 ~200 kg. hence,
the payback period is only 2-3 months.